Presentations lets you build the deck for your next meeting from your own files, on your own template, every figure checked
Your CIP quarterly update, from the files you choose
Write a brief, set the template and length, and see the file behind every slide before you build
The CIP quarterly update, start to finish: four files chosen from Reference Desk (CIP workbook FY2027.xlsx, Lakeside storm drain project sheet.pdf, Staff report, FY2027 paving contract award.pdf, Council work session agenda, October 20.pdf), a brief, the City council template at Short length to present live, an outline of six slides that names the file behind each one, and the finished deck.
CIP workbook FY2027.xlsx, Lakeside storm drain project sheet.pdf, Staff report, FY2027 paving contract award.pdf, Council work session agenda, October 20.pdf
Decks given at public meetings, on your template or MainBranch’s
A state highway project, a county budget and a city housing bond, each with the figures its government published
Photographs
Fremont Bridge, Seattle, Steven Pavlov, CC BY-SA 4.0. Madison Street, Seattle, SounderBruce, CC BY-SA 4.0. The Carlyle, Providence, Kenneth C. Zirkel, CC BY-SA 4.0. 14th Street NW, Washington, Keizers, CC BY-SA 4.0. Paving, Oregon, Oregon Department of Transportation, CC BY 2.0. I-70 construction at Floyd Hill, Colorado, Ben1152000, CC BY-SA 4.0. Floyd Hill, Colorado, Jeffrey Beall, CC BY-SA 3.0. Water tower, Derby, Kansas, Staryu, CC0 1.0. Sprinkler alarm, Butler, Pennsylvania, The Navigators, CC0 1.0. White Tank Mountain Regional Park, Maricopa County, Gage Skidmore, CC BY-SA 3.0. Maricopa County Court House, Phoenix, Wars, CC BY 3.0. Roanoke from Mill Mountain, Joe Ravi, CC BY-SA 3.0. Elmwood Park Amphitheater, Roanoke, United States Navy Band, Public domain.
See the line in your own file behind any figure
Match a rounded figure to its file or take an unsourced sentence off the slide before anyone sees the deck
Lakeside storm drain project
Project sheet, as of September 30
- Original contract
- $1,240,000
- Contingency, 10 percent
- $124,000
- Change Order 1
- $22,480
- Change Order 2
- $37,200
- Change Order 3, station 4+60
- $48,200
- Change orders to date
- $107,880, 8.7 percent of the contract
- Contingency remaining
- $16,120
Change Order 3 covers the conflict found at station 4+60 on September 15, recorded in Daily Report 0915 and RFI 12.
Every deck, ready for the meeting or the agenda packet
Editable in PowerPoint
Charts and tables you can edit, speaker notes and your template’s own layouts, or a PDF that matches the deck page for page.
Sized to the agenda
Short at 6 to 8 slides, Standard at 10 to 14 or Long at 15 to 20.
Present or hand out
To present, the deck puts fewer words on each slide and the detail in your notes. To hand out, it puts the full explanation on the page.
Saved and logged
Each deck saves to Reference Desk beside its files, and the build and every export land in the Action Log.
See a deck you know, built from the files behind it
Bring one from a recent meeting, with its spreadsheets and reports, to a demo
- Brief
- A few sentences, the way you would ask a colleague
- Template
- Your PowerPoint template, uploaded once
- Figures
- Every one checked against the files you picked
- Controls
- Single sign-on over SAML 2.0 and OpenID Connect, MFA enforced and role-based access







