Skip navigation
Menu

Documents and Spreadsheets lets you draft staff reports, memos, sheets and decks from your own records, ready for review

Draft any staff report, memo, letter or notice

From the files behind it, ready for the person who reviews it

Staff report, Public Works, for council. The ask: Draft the staff report for the FY2027 paving contract award, for the October 27 meeting. The draft, Staff report, FY2027 paving contract award: Recommendation: Award the FY2027 paving contract to the lowest responsive and responsible bidder in the amount of $1,612,400. Background: Six bids were opened September 29, 2026 at 2:00 p.m., under Addenda 1 and 2. The engineer’s estimate was $1,550,000. Fiscal impact: $1,449,000 is left in Resurfacing after the first quarter, $163,400 less than the award. In review, Public Works Director.

Build the sheets every office keeps

From a budget comparison to a change order log, formulas and charts included

  • See open work by district

    84 of the 312 open pothole reports are in North

  • Set this year’s budget beside last year’s

    Resurfacing is up $150,000 from last year and Sidewalks down $40,000

  • Keep a running change order log

    After three change orders the contract is up 8.7 percent, inside its 10 percent contingency

  • Count plan review comments by status

    31 of the 42 comments on 1420 Oak Street are resolved after cycle 3

  • Measure each project against its budget

    71 percent of the Lakeside storm drain budget is spent

  • Break overtime down by cause

    40 percent of overtime is backfill to minimum staffing, with 14 positions vacant

  • Show a rate change on a typical bill

    At 6,000 gallons, a typical bill moves from $96.40 to $103.15

  • See which departments have filed

    By Wednesday at noon, four departments had filed for the council update

Get a spreadsheet that answers your question

Ask about a workbook in your own words and get the sheet that answers it, every formula open to check

The sheet that answers “Which lines are more than $50,000 ahead of the year-to-date pace?”, built from Street maintenance budget FY2027.xlsx: each line’s budget and spending from the file, a Pace column at one quarter of each budget, an Ahead of pace column of spending less pace, the lines more than $50,000 ahead highlighted and a Total row. After one quarter, a line on pace is 25 percent spent. Two lines are more than $50,000 ahead: Patching and Resurfacing.

Share, save and present what you draft

  • Share in the formats you use

    Send documents as Google Docs, PDF or Markdown, tables as Google Sheets and decks as PowerPoint

  • Save once to Reference Desk

    Keep a draft or a table in one place and pick it up again from any app in the workspace

    See Reference Desk
  • Present in three lengths

    Choose short, standard or long, to present in person or send as a handout

    See how a deck is made

You decide who signs in and what each person reaches through your own identity provider, with every action logged

  • Single sign-on

    Your team signs in with the accounts it already has, over SAML 2.0 and OpenID Connect, with Microsoft Entra ID, Okta, Google Workspace, ADFS or Ping Identity.

  • Role-based access

    Each person reaches only what their own account can open. Your admin chooses who is an Owner, an Admin or a Member.

  • Audit logging

    The Action Log records who did what and when: every prompt, answer, upload, export and sign-⁠in, ready to export for a public records request.

Bring the files behind your next report to a demo

See the staff report, the sheet and the deck drafted from them

Bring
A table you report from or the template your decks use
Draft
The memo, letter, notice, sheet or deck you need next
Export
Google Docs, PDF or PowerPoint